Skip to content

Scheduling Assistance
Tool (SAT)

Tired of the slow and laborious process of building schedules in Primavera P6? SAT revolutionizes schedule development by letting you create complex schedules in Excel and export them seamlessly into P6 — with full resource loading and no manual calculations.

What is SAT for?

  • Rapid Schedule Development Build high-volume WBS (up to Level 8) and activity lists directly in Excel.
  • Automated Resource Loading Input BOQ data and export Labor, Non-Labor, and Material resources with budgeted units — no manual entry required.
  • Integrated Norm Table Standardized resource allocation using a comprehensive library of construction activity norms.

Core Capabilities

📂

WBS & Activity Development

Add large volumes of Work Breakdown Structure elements up to Level 8 and seamlessly integrate deliverable lists as activities.

⚙️

Automated Resource Loading

Input Bill of Quantities (BOQ) and export budgeted units for Labor, Non-Labor, and Material directly into Primavera P6.

📊

Integrated Norm Table

Use standardized construction activity norms for consistent and accurate resource allocation across all resource types.

🔄

Dynamic Resource Management

Easily delete, update, or reassign resources after BOQ or Norm changes — no need to rebuild the entire schedule.

Why Professionals Choose SAT

⏱️

Dramatic Time Savings

Significantly reduce the time and cost of schedule development and resource loading.

📋

No Complex Calculations

Build and load resources without manual formulas or heavy data entry in Primavera P6.

📚

Standardized Norms

Built-in comprehensive library of construction activity norms for consistent resource allocation.

See How It Works

SAT utilises a unique technique for resource loading of construction schedules in P6, making it an essential tool for construction planning engineers. Watch the video to explore SAT's features and benefits.

▶ Feature Spotlight SAT

System Requirements

SAT is designed for 64-bit Windows 10/11 and Microsoft Excel 2016 or higher (64-bit version).
Note: SAT cannot be installed on company laptops with strict IT restrictions. Please check with your IT department before purchasing.

Windows 10 / 11 (64-bit)
MS Excel 2016+ (64-bit)
Database Support: SQLite, SQL Server, Oracle 12c / 11g