Earned Value Management

Analysis Toolkit

Published 04 March 2021

In most of the project, the Project control team require to prepare analysis to assist the management team to in decision making. When the analysis gets presented to the team or other parties, there is always argument around the bases of the calculation, data range, asking for more what-if scenarios etc. Also, the available techniques are generally linear despite the S-Curves shapes that are not liner. As a result, it brings more arguments to the table. For example, based on the data from the S-Curve below, four scenarios could be analysed. As it displays, the analyses are linear, based on the data range provide different results and all ignore the S-Curve shape.

Linear vs S-Curve Analysis
Example: Linear analysis ignoring S-Curve shapes

So, what is/ are solution(s)

Our newly developed analysis toolkit Equipped with unique features to undertake complex, non-linear analysis for modern engineering projects.

The following steps illustrate how the toolkit works:

01. Project & Package Management

Add projects and assign specific packages or disciplines to the project workflow.

Add Projects Assign Packages

02. Scenario Development

Easily add multiple "what-if" scenarios to each package or discipline for comprehensive sensitivity testing.

Add Scenarios

03. Probabilistic Results

Run the analysis to display integrated results, including P20, P60, and P80 completion dates.

Analysis Results Display

Single Package View

Display all scenarios for a single package in one chart.

Single Package Chart

Multi-Package View

Overlay scenarios from all project packages for a global overview.

Global Scenarios Chart

Main Analysis and Features of the Toolkit

Earned Schedule

Two complete sets of analysis based on Earned Schedule (ES) principles.

Resource Planning

Analysis based on resource count, production rates, and capacity limits.

Data Export

All analysis data can be exported to separate Excel files for further review.

Khono Analysis Toolkit

This is a must have tool for every senior PM, Planner and Cost Engineers working in Project.

Explore More Info

Discussion

ME
Medical Marijuana Card in Chulavista
05 Mar 2021

Every weekend i used to go to see this site, for thereason that i want enjoyment, since this this website conations actually fastidious funny data too. Dale Errol Kaycee

NA
Natural Beauty Products
05 Mar 2021

This is a good tip especially to those new to the blogosphere. Simple but very precise information?Many thanks for sharing this one. A must read post! Lexy Tuckie Enrica

Leave a Comment