Loader
 

Scheduling Assistance Tool (SAT)

SAT:  The ultimate tool for Schedule Resource Loading

The Scheduling Assistance Tool has been developed to alleviate the cumbersome process of Schedule development. SAT’s platform enables the planner to develop the schedule in Excel then export it to P6. It is the only tool that allows to undertakes the resource loading without any calculations and data entry into the Primavera. It assists in the following:

  • Add large volume of WBS up to level 8
  • Add deliverable list as activities into the schedule
  • Develop Resource Sheet including labor, non-labor and material
  • Norm table is integrated
  • Input BOQ, export resources including budgeted units  for Labor, Non-Labor and Material).
  • Delete/remove resource from P6 Schedule, Reassign the resources after updating the BOQ or Norms

Some of the benefits are as follows:

  • Save time and cost of schedule development considerably
  • Save time and cost of Schedule Resource Loading substantially
  • Complete the resource loading without any calculation and data entry
  • The Norms for many construction activities have been integrated within SAT.

SAT Version 2.71:  $320 / R5900

System Requirements:

  • SAT is developed to be used in 64bit Windows and 64bit MS Excel. To run SAT on 32bit systems, before purchase, contact info@khonopc.com
  • SAT works on Windows 10 (64bit) and MS Excel 2016 32bit.
  • SAT will not run on the company’s laptop/computer due to restrictions set up by IT. So, before purchase, make sure the company’s IT will permit to run SAT and installation of the required software/drivers.
  • SAT connects only to Standalone Primavera P6 database.
  • SAT connects to SQLite, SQL Server, Oracle 12c and 11g databases (Oracle 11g has been tested on Windows 7)

Recommendations:

  • To use the SAT correctly, read the manual carefully,
  • Watch the attached video clips,
  • For any support, contact info@khonopc.com

 

Who is it for?

  • Schedulers,
  • Planners,
  • Planning Engineers
  • Senior and Lead Planners
  • Project Control Managers

TUTORIAL CLIPS-Please watch these video clips:

1- Introduction

2- Overview

3- Add WSB and Activity

4- Resource Assignment

Contact us now for a free quote on your project