How to monitor Engineering progress?

How to monitor Engineering progress?

Revisions and reworks of drawings are unavoidable as part of the Engineering. As a result, the progress measurement and reporting have to be able to manage the reworks and revisions. On most instances, the planner uses the 2 practices below:
1- Does not change the progress of the drawing until the rework progress catches up!
2- Changes the progress as per the rework progress

On the 1st one, the progress does not fluctuate but stays flat. As a result, the Engineering team would not be happy.
On the 2nd one, the progress fluctuates and adds more pressure and stress to the team!
Less experienced client and contractor teams would not prepare any mitigation plan upfront to manage this situation which as a result, makes the project environment so stressful that adversely affects the productivity of the team.
So, if you are busy with Engineering works, how do you manage the revisions and reworks? Comment below to discuss