Are you a senior planner, lead planner or planning manager? If so, I recommend to read this post and watch the video.

As you do know, Schedule Resource Loading is a cumbersome and time consuming process that requires data, calculations and capturing the results into the Schedule. Owing to the following reasons, the situation gets unbearable:

  • On many Projects, due to contractual constraints there is limited time to prepare and submit a resource loaded baseline Schedule
  • Client requests to load skill sets, commodity, BOQ and cost
  • If the team has limited experience and the seniors have to train and teach them, in the limited time available, to do it correctly, that adds more stress to the entire team
  • Development of a resource pool with material and UOM
  • Developing Norm tables and use them in calculation
  • Calculating the Budgeted Units for all resource types per activity
  • Capturing all the calculated results into the Schedule

To assist you through the process and complete the Resource loading quicker and accurately, we have developed a NEW & Unique Excel based application. The Scheduling Assistance Tool (SAT) has many features that almost undertakes the entire resource loading process! Once watched the video, let us know what your thoughts are or send us an email to discuss in more detail.

Remember, as a senior you have much more responsibility than training of your team in a very short period of time and expect them to produce such a complex task accurately.

To see more detail about SAT, please refer to:

Application